On the way at last.

Well here we are. Waking up in a hotel in Frome - we all got here eventually and it is Tech 2 - day one.

Yesterday was fun in it’s own way. My daughter’s 7th birthday was being celebrated as I am away for the actual day on Monday. We opened presents (she got her first bicycle) before JJ and Richard arrived with Howard Payne.

They must have wondered why my 5 year old Archie was so scared. May of had something to do with my teenager whispering ‘Hey Archie, these men are power rangers’

Nigel is learning to dive and was being teased by Howard about the PADI RDP on the kitchen table. Nigel asked Jarrod how much deco he had done, to which the answer was about 20 hours after an 8 hour dive at 90 meters. To think I get bored after 45 minutes.

Andy Kerslake turned up and we set off to Frome - to meet Al, Frase, JK, David and Brian. Brian, it turned out was running 3 hours late and there were many jokes about putting the sculpture of a horses head in his bed!

Dinner in Frome followed by form filling and general introductory lecture from Jarrod then, avoiding the Kareoke session in the bar, a drink and bed.

So, full circle, back to where I started. Al’s alarm will go off in 2 minutes so time to start.

Bookmark, Spidge, or Discuss this Article
    Bookmark On the way at last. at myspidge.com        Discuss this article at Yorkshire Divers

Gas….

Wow - what problems we have had getting fills for the weekend.

My local shop shut a month or so ago. We figured that we would be able to use the NDC but a local dispute there means that they temporarily have no trimix filling capability. Al decided to take the sets to St Albans - but that didn’t work time wise so he ended up taking a day off work on Monday and taking my two sets and his two down to Breakwater for fills.

Then Fraser comes back from the States and owns up that he has an empty set and stage, and no possibility of getting time off work to do anything about it. This results in a late night dash to meet up at Wraysbury to hand over the empties so I could deliver them to Andy Kerslake who would fill them at Runneymead… Wow - on this occasion the diving will feel easy compared to the pre dive logistics ;o)

Weather looking good for the weekend though - and Andy has just phoned me to say ready to roll - so starting to get nervous.

Bookmark, Spidge, or Discuss this Article
    Bookmark Gas…. at myspidge.com        Discuss this article at Yorkshire Divers

That tech 1 - it’s hard you know…

Image hosted by TinyPic.com

First sign that something was up was bubbles behind my head from the right. Shutting the post down, I signalled to Al who came over to help…just at the time that Fraser when OOA Knowing that Fraser’s need at this stage was greater than mine I waited on my backup for Al to be able to check the first stage and repressurise…when he did the bubbles had stopped - and we all relaxed for an instant ….the same instant that Andy Kerslake was pulling off loose line and wrapping it round Al and Frase

Well, it’s the end of day one, Tech 1. We’ve just crashed out after a 19 hour day, 16 hours of which were under instruction to a greater or lesser extent. The most important thing today was we didn’t die…there were times it came close but we survived to try again tomorrow

The day started with theory and then line laying in the garden of the B&B. It was quite funny when Andy tied off to a garden fountain - which then toppled over as he pulled the line taught - but not quite so funny when it took us 6 minutes to return blind along line which took us only 1 minute to swim when sighted.

Off to a very busy Stoney Cove at lunchtime for the first dive of the day. First were individual s drills and valve drills. When these were duely completed with no issues we went line astern and Fraser tied off a primary tie to start running line. This is roughly where my recollection of the dive starts to blur…

Multiple valve failures, loose line, collapsed SMBs, OOAs wing inflate problems - you name it - it all happened, often simultaneously A touch of class at the end was Andy’s insistance that we each put up SMBs which he then knitted together at the surface. We did all surface laughing though

Dive 2 was similar - although Al was running the line. It went somewhat more smoothly until Andy managed to pull a good 20 meters of line off the reel and wrap Al and Fraser together thoroughly - several times round manifolds, legs, arms etc. I went back to help and was confronted with line floating everywhere in the water and the hand of Kerslake dropping a loop of it on to me for good measure. An anglo saxon hand signal stopped this one and I untangled Al and then Fraser who was OOA but didn’t know what to do with what I had untangled. I gathered it up round my hand which was not perhaps the brightest thing I’ve ever done - next time a rock would be good. Andy repaid me for my cheeky hand signal with a valve failure.

Fraser got fed up with my housekeeping and huried us up back along the line to the exit - as we had an OOA he was of the view that the priority was out. Only problem with that was that the slack line was free for Andy to play with again. Flashing lights alerted to the fact that buddies were again trussed up but this time when the line was freed I attached the slack to the armoured carrier instead to try to get rid of it. Line, nasty stuff

Back to the B&B for video debriefing and more theory…then dinner and dive talk….then a bit of kit fettling and bed.

And that’s where I am now…writing this so that at the end of the course we have some record of what we did. As a team we had a damn good day…more enjoyable than we thought it would be…with some valuable lessons learned.

PS - if the title doesn’t make sense…look here http://www.yorkshire-divers.co.uk/f…1919#post281919

Bookmark, Spidge, or Discuss this Article
    Bookmark That tech 1 - it’s hard you know… at myspidge.com        Discuss this article at Yorkshire Divers